Federal Ministry of Works (FMW)
... building the backbone for Development ...
Follow Us:
Welcome To Federal Ministry Of Works.
Minister Federal Ministry Of Works Engr. David Umahi.
Road Construction Inspection Tour.
Road Construction Inspection Tour.
Road Construction Inspection Tour.
Road Inspection.
Road Construction Inspection Tour.
Road Inspection.
Road Construction Inspection Tour.
Road Construction Inspection Tour.
Feb
10
2026

LATEST PRESS


FG RESTORES CRITICAL ROAD LINKS, CURBS FLOODING IN BAUCHI COMMUNITIES

The Federal Ministry of Works continues to implement strategic infrastructure interventions across Nigeria, under the Renewed Hope Agenda of His Excellency, President Bola Ahmed Tinubu, GCFR. Since its inception in May, 2023, the administration has been implementing numerous federal road and bridge projects nationwide, focusing on priority corridors to improve connectivity, safety, and socio-economic outcomes.

The North-East Zone National Media Tour and Commissioning of Emergency/Special Intervention Projects kicked off in Bauchi State on Sunday, 8th February, 2026, with a visit to the Rehabilitation of Bauchi–Gombe Road, a vital corridor linking Bauchi, Gombe, Adamawa, and Taraba States. The 35-kilometre section of the alignment was awarded in 2024 to Messrs Triacta (Nigeria) Limited at a contract sum of N39,999,177,118.59. The rehabilitation project aims to restore a major transport artery that has, in recent times, recorded frequent accidents and prolonged travel times. Ongoing works have already resulted in a noticeable reduction in road crashes,  They are expected to significantly improve safety, reduce travel time, and cost of vehicle maintenance, as well as boost economic activities across the North-East Zone, upon completion.

Also, as part of its ongoing efforts toward the provision of road infrastructure to Nigerians, the Federal Ministry of Works commissioned two completed emergency and special intervention projects on the same day, along the Bauchi–Darazo–Kari—Potiskum Road. The Federal Government’s recent road interventions in Bauchi State include the Emergency Repair of a Collapsed Concrete-Lined 3-Cell Pipe Culvert at Konkiyel Town (Chainage CH 120+500). The project was executed to permanently address perennial flooding, protect adjoining farmlands and communities, and safeguard the integrity of the federal road infrastructure. This was followed by the Emergency Repair of a Collapsed Section of a 2-Cell Pipe Culvert and Concrete-Lined Drain at Sauke Village (Chainage CH 162+000), restoring hydraulic capacity, mitigating flood risks, improving road safety, and ensuring uninterrupted movement of people, services, and goods.

The Honourable Minister of Works, Engr. David Nweze Umahi, CON, FNSE, FNATE, who was ably represented by the Bauchi State Chairman of the Nigeria Union of Journalists (NUJ), Comrade Umar Saidu, led the commissioning ceremonies. He described the interventions as transformative, emphasising their role in bringing lasting relief to affected communities, preventing recurring flood damage, and enhancing the socio-economic well-being of the people of Bauchi State and the wider North-East Zone. He called for sustained collaboration among stakeholders to ensure the durability and effectiveness of both ongoing and 
completed projects.

Giving technical insight into the projects during the exercise, the Federal Controller of Works in Bauchi State, Engineer Bashiru Adamu, explained that the interventions form part of the 260 Emergency Projects initiated at the outset of the present administration to address critical infrastructure failures, nationwide. He noted that the Bauchi–Gombe road rehabilitation and the emergency drainage works along the Bauchi–Darazo–Kari—Potiskum Road were executed to mitigate flooding and protect federal assets. It will also help in mitigating the effects of climate change, he added.
According to him, the culverts and concrete-lined drains are critical hydraulic structures that ensure roads, farmlands, and communities remain safe and accessible.

In his remarks, an official of the Bauchi State Council for the Regulation of Engineering in Nigeria (COREN), Engineer Ibrahim Ahmed, commended the Federal Government for its prompt response to infrastructure challenges and expressed satisfaction with the engagement of licensed engineers and technologists on the projects, encouraging sustained professional oversight to further strengthen delivery standards.

Similarly, the Vice Chairman of the Nigerian Society of Engineers (NSE), Bauchi Branch, Engineer Shehu Wakili, underscored the strategic importance of the Bauchi–Gombe and Bauchi–Potiskum corridors to regional connectivity and economic growth. He noted that the emergency culverts and drainage works protect the federal road network and support the smooth movement of goods and services, while urging host communities to complement government efforts through environmental protection measures such as the planting of trees.

Speaking on the project, the Project Manager of Triacta (Nigeria) Limited,  Mr. Joseph Samaha, expressed appreciation to the Federal Government for its support and assured that the Bauchi–Gombe Road rehabilitation is progressing according to schedule. He confirmed that works, including the construction of drainage, binder courses, and asphalt surfacing, are ongoing, with full completion expected within the year.

Mallam Zakari Ya’ u,  Head of Sauke Village, expressed profound gratitude to the current administration for the emergency intervention and prayed that Allah sustains it. Speaking on behalf of the host communities, Mallam Zakari Ya’ u stated that the projects have brought lasting relief by preventing annual flooding, protecting farmlands, and improving access for residents. He pledged the community’s commitment to protecting and maintaining the infrastructure to ensure its sustained benefits.

Aug
26
2018

FG Orders Remedial Works On Road Washouts The attention of the Honourable Minister of Power, Works and Housing, Mr. Babatunde Raji Fashola, SAN, has been drawn to embankment and road washouts at five different locations across the country today which usual seasonal occurrences arise from heavy downpours around this period of the year and perhaps the current emergent global warming. The embankment washouts include km 7+250 from Bida, along recently awarded Lambata-Lapai-Bida road project to Messrs CGC Nig. Plc, immediately after the Nigerian Cereal Institute in Niger State. The contractor has commenced immediate mobilization to site on the directive of the ministry and will commence emergency reinstatement work by tomorrow Sunday August 26th to enable free flow of traffic. Also in Niger State is the Armco Pipe collapse at km 16 along  Bida – Minna,  Niger State road. The Niger State Government has commissioned a Federal contractor on that corridor, Messrs Triacta Nig. Plc to restore the anomaly for safe passage. Other washouts are at Kwaita bridge along Abuja – Lokoja carriage way where the subsisting contractor, Reynolds Construction Company has been directed to commence immediate remedial works; embarkment washout at Bayo LGA on the road linking Gombe – Biu in Borno State where FIK Construction Company on the corridor has been directed to move in and commence palliative measures and finally the embankment washout at Jabbi-Lamba Village along Yola – Mubi road before Girei LGA. Fashola has appealed to motorists and other road users to be cautious on the mentioned locations and adhere strictly to safety instructions of the Corps Marshalls who have been drafted by the Corps Marshall, Federal Road Safety Corps, Dr. Boboye Oyeyemi to immediately move in and ensure traffic control and possible redirection of traffic where necessary. Fashola has enjoined all Nigerians to immediately report any such occurrence on the Federal Highways as this season marks the peak of the rainy season in order to avoid loss of human lives and properties. ...

Aug
16
2018

FEC Approves Road Project Linking Anambra and Enugu States The Federal Executive Council (FEC) on Wednesday approved the sum of N15.7 billion for the completion of a road project that stretches from Enugu State to Anambra State. The Minister of Power Works and Housing, Babatunde Fashola, disclosed this while briefing newsmen after the FEC meeting presided over by the Acting President, Prof. Yemi Osinbajo, on Wednesday in Abuja. He said the project included roads captured as Umana-Ndiagu, Agba, Ebenebe, Amansea, Awka, Anambra which spurred into Umumba in Enugu State. “The contract was awarded in 2012 and there were spurs off the Enugu-Onitsha Highway to six different communities, Ebenebe, Agba, Umana-Ndiagu, Nkpodu, Ekeagu and Ugwuoba. “Because of lack of appropriate budgeting and funding all of these projects could not be completed. “There were failures in the implementation as we inherited it; there was also the need to provide for erosion control measures and drains. “That has led to the revision of the existing contract awarded in 2012 from N10.3 billion to 15.734billion.” Fashola said that it was the revision to enable the contract to be completed that was presented and approved by the council. Earlier, Alhaji Lai Mohammed, the Minister of Information and Culture, said that Wednesday’s FEC briefing was one of the shortest as only one minister would brief newsmen on projects that had been approved.(NAN) ...

Aug
14
2018

Electricity: Customer Eligibility Policy Yields Result – Fashola The Customer Eligibility Policy of the Federal Government has started yielding result, with five industrial customers presently buying electricity directly from Generation Companies (GenCos). The Minister of Power, Works and Housing, Babatunde Fashola made this known on Monday at the 29th stakeholders’ meeting organised by Mainstream Energy Solutions Ltd., in Minna. The News Agency of Nigeria (NAN) reports that the Customer Eligibility Policy was declared by the minister in 2017 to improve distribution side of electricity and facilitate better power supply to consumers who consumed up to two mws and above. “From reports reaching me, five industrial customers are now benefitting from the policy and taking their power directly from a GENCO, which incidentally is our host today, messers Mainstream Energy Ltd. “We also have a list of 26 industrial customers who are seeking to benefit from the policy,’’ Fashola said. According him , directives have been issued to the Nigeria Electricity Regulatory Commission (NERC) to work out and implement competition transition charges as provided by Law, to safeguard operators from any losses arising from the policy. “We will continue to monitor the impact of the policy and remain flexible to keep what works and change what does not. “I urge everybody to remain open-minded, adaptive and responsive.’’ He said the provision of N701 billion payment assurance guaranteed by government was to give comfort to investors in the generation side of the value chain. This, he said was designed to ensure the payment of power produced by GenCos. “Since its implementation in 2017, recovery of payments by GenCos has increased from 20 per cent to 80 per cent and power supply capacity has improved from 4,000mw to 7,000mw and there is an appetite by other players to participate. “Is it perfect, certainly not, do the GenCos like it, I am sure that they will tell that 80 per cent recovery is better for business than 20 per cent recovery, but they would rather have 100 per cent recovery,’’ he said. The minster, however, said that GenCos must transparently invoice for their output made on generation of power. “We must harmonise the price of gas for payment under the scheme, where there are differential prices arising from different gas suppliers. “Therefore, we must work as owners of the policy to nurture and improve on its capabilities. On Meter Asset Provider (MAP), he said the policy was introduced to address the meter supply gap, relieve the DISCOs of the financial burden of meters. He said reports reaching him indicated that there was an embracement of the policy, adding that entrepreneurs were showing interest and talking to banks to raise finance. On energising educational institutions and markets, Fashola said, “these are government-led initiatives based on the rural electrification plan approved by the President in 2016 to provide access to power for rural dwellers and vulnerable members of our society.’’ He said government had proposed to use six small hydro dams that had been abandoned for decades to energise Federal Government owned universities and some markets. “There are currently 15 markets under contemplation with Ariaria, Sabon Gari and Sura markets in Aba, Kano and Lagos as flagships. “The six hydro dams are to be concessioned to private operators on Build, Operate, and Transfer (BOT),’’ he said. Source: NAN ...

First First First

LIVE ACTIVITY FEED

PUBLIC ANNOUNCEMENT


Nov
03
2025

  


PHOTO NEWS

Jun
02
2025

DRIVING NIGERIA’S FUTURE: CELEBRATING TWO YEARS OF TRANSFORMATIVE LEADERSHIP AND THE LAGOS-CALABAR COASTAL HIGHWAY MILESTONE

DRIVING NIGERIA’S FUTURE: CELEBRATING TWO YEARS OF TRANSFORMATIVE LEADERSHIP AND THE LAGOS-CALABAR COASTAL HIGHWAY MILESTONE

Click To View More Pictures

PHOTO NEWS

Apr
28
2025

MID -TERM REVIEW MEETING ON THE IMPLIMENTATION OF THE DECISIONS REACHED AT THE 29TH NATIONAL COUNCIL ON WORKS (NCW) DAY 1

MID -TERM REVIEW MEETING ON THE IMPLIMENTATION OF THE DECISIONS REACHED AT THE 29TH NATIONAL COUNCIL ON WORKS (NCW) DAY 1

Click To View More Pictures