FG PUSHES AHEAD WITH STRATEGIC ROAD PROJECTS IN BORNO DESPITE SECURITY CHALLENGES The Federal Ministry of Works has restated its avowed intention to rehabilitate the Maiduguri–Monguno Road (Section I) in Borno State, as work progresses steadily despite prevailing security and logistical challenges. As the nationwide media tour of the North East Zone continues, the Federal Controller of Works in the State, Engr. Salihu Adamu assured Nigerians that the project will be completed despite persistent security and logistical constraints. “The biggest challenge faced by the contractor is insecurity. There are pockets of attacks on the highways, and this has forced them to take longer and safer routes to source construction materials,” he stated, while addressing the media at the project site in Maiduguri. The project was initially awarded in 2018 to QUMECS (Nigeria) Limited at a contract sum of ₦21.73 billion, traversing 105.6 kilometres. Following a technical review and scope adjustment, the project was revised to incorporate a flexible pavement structure with asphaltic concrete shoulders, bringing the current contract sum to ₦28.37 billion to reflect prevailing realities and enhanced engineering specifications. Phase 1 of the project covers 30 kilometres. Significant progress has been recorded, with approximately 5.8 kilometres completed up to binder course level and about 8 kilometres of stone base executed. Clearance works have also extended beyond 15 kilometres, while shoulder construction is ongoing, in line with the Ministry’s revised policy, which replaces surface dressing with asphaltic concrete shoulders to provide stronger structural protection for the carriageway and enhanced pavement durability. As security remains the major constraint on the Maiduguri–Monguno corridor, Borno State continues to operate under emergency conditions, with base and sub-base laterite sourced from Ngamdu near the Yobe State border (about 150 km away). And stone materials hauled from as far as Shira town in Bauchi State (approximately 450 km) due to restricted access and security considerations like the ban on the blasting of rocks in the state. The Project Manager for the company, Engr. Bukar Kadai, confirmed that the contractor remains fully mobilised on site with two active teams handling shoulder construction and stone base operations simultaneously, while asphalt laying is scheduled to commence following the delivery of bitumen to the site, soon. Also speaking on the same project, the Chairman of the Nigerian Society of Engineers (NSE), Maiduguri Branch, Engr. Mohammed Shettima expressed satisfaction with the quality of work, stating that the rehabilitation will ease transportation challenges for residents and road users. In another vein, the Chairman of the Nigeria Union of Journalists (NUJ), Borno State Council, Abdulkarim Haruna, inaugurated the completed Limited Rehabilitation of Kaga–Gubio Road, Sections I and II outside Benisheik Town, on behalf of the Honourable Minister of Works, Engr. David Umahi, CON, FNSE, FNATE. He described the road as a strategic one for economic empowerment and social inclusion. He stated, “Roads are a means of empowering the people. This road connecting to Benisheik, which serves as a gateway to Maiduguri and Yobe state, is a very positive development.” He further urged the media to continue sensitising Nigerians on ongoing infrastructure reforms and national development efforts of the administration of President Bola Ahmed Tinubu, GCFR. The FCW described the Kaga–Gubio Road as a critical intervention, facilitating the movement of agricultural produce into Maiduguri and other parts of the zone, strengthening commercial activities within the corridor. He explained that the project forms part of a broader emergency and special works designed to safeguard existing infrastructure, improve mobility, and support economic stability in areas facing security challenges.
Investors In Omotosho Power Plant Commend FG’s Efforts To Solve Gas, Liquidity Issues In Power Sector * As Omotosho Community braces up for supply from Power Plant after years of black out * Managing Director NDPHC assures that the community would be connected before end of April * Fashola seeks factual reporting of Power Sector developments, commends confidence of Nigerian investors in their economy The Managing Director of Omotosho Power Company, Engr. Samuel Itsekiri has commended the Federal Government for the steps being taken address the Gas and liquidity challenges as well as resolving the community issues affecting the performance of the Power Plant. Giving a background of the Omotosho Power Plant after conducting the Hon. Minister of Power, Works and Housing, Mr Babatunde Fashola SAN round during his tour of Projects in the South West zone, the Managing Director said the Power Plant located at the Omotosho Forest Reserve in Okitipupa LGA, was commissioned on April 17, 2007, privatized on November 1, 2013 to Pacific Energy Company Limited, and is “an open cycle gas-turban power plant with a capacity of 335MW”. But, according to him, under local conditions, the capacity is 304MWs, adding with eight turbines at takeover, the availability was very poor. “We had just three units available at that time running at minimal load. But as at today due to the efforts of the Pacific Group, who sourced for funds and the amount of money spent, we are happy to announce to you that the plant records (80) per cent availability”, he said. He told the Minister, “We have all our units running and it might interest you to know that in December 2015 when we had enough gas we generated 307MWs, 2MWs above installed capacity. All the plants are still very healthy. This feat has been possible because of our technical experts”. On some of the constraints the company has, the Managing Director who listed gas as the major one, however, thanked the Minister for the efforts he is making to address it adding that about three months back the company barely ran 1,2 or 3 units at reduced load. “But as at today, because of the efforts you are making and that of the Government, we have six units running at full load and the other two are still available. The gas supply has been improving gradually; so as soon as the gas improves further we will add the other two”, he assured. He commended the Minister for the efforts he is also making to make funds available for Generation Companies like Omotosho disclosing that he just returned from Abuja where he had gone for a meeting and learnt of the efforts the Minister has made to improve their fund supply. On stability, which he also named as another major challenges, the Managing Director expressed delight that the Transmission Company of Nigeria (TCN) was now working on it because, according to him, the Minister has given them a marching order to look at it. He added, however, “But that area has not been totally solved because we are still having some few tripping. Last week we still recorded some and this week I heard we’ve recorded one”, expressing joy that the level of tripping was reducing as work goes on. “We believe that in a short time from now that issue will also be resolved”, he said. He thanked the Minister for his intervention on the community issue adding, “The power supply to the host community is an issue that has been there for a long time. But happily about a month ago we drew the attention of the Hon. Minister to it and he has taken it up. Presently the Niger Delta Power Holding Company is on it. A team visited me about a week ago to assess what is to be done and is being done”. He commended the Minister’s commitment to the “onerous task of providing light for all Nigerians”. After years of blackout in spite of playing host to two power stations (335 Megawatts Omotosho Phase I Power Plant now owned by Pacific Energy Limited and 500MW Megawatts Omotosho Phase II Power Plant developed by Niger Delta Power Holding Company Limited), the Omotosho Community will soon be beneficiaries of electricity supply from the Power Plants. Earlier, while speaking with the staff of the company and members of the Omotosho Community at the premises of the company, Fashola disclosed that the Managing Director of Niger Delta Power Holding Company Limited, Mr Chiedu Ugbo has assured that the community would be hooked onto the power before the end of April. Fashola, who noted that issue of the local community supply was an inherited problem, explained further that it took some time to solve because government felt that the larger national interest of protecting the power plant transmission substation, commissioned in 2007, was very important just like the need to supply light to the community. The Niger Delta Power Holding Company Limited had constructed a 33kV distribution line from the power plant substation to the Omotosho Community. However, it could not be connected because of concerns that distribution faults arising from the line as a consequence of abnormal load connections could damage the Power Transformer in the Power plant substation, which will adversely affect the power plant itself. Assuring the community that the issue was already being addressed, the Minister, said the Niger Delta Power Holding Company (NDPHC) had come to assess the situation and were doing what was necessary. He thanked the Omotosho Community for waiting and for forbearing, adding, “But help and solution is on the way”. Fashola, who described the decision by Pacific Energy Company Limited to invest in the Omotosho Phase 1 Plant as “a big statement of confidence by Nigerians in their economy”, expressed delight that the reality would provide a basis for true and factual reporting for the media. He said the facts as witnessed during the tour proved wrong the tendency of some sections of the media whom he said sometimes indulge in over-generalization that the companies that bought the nation’s power assets were not investing. The Minister declared, “I am happy that some of you the press men are here; because I hope that this will begin to provide the factual basis for your reporting; Because there has been too much generalization of what is happening and what is not happening and it is not helping the public to know the truth and facts from opinions”. “This was an asset when they bought it, as you have seen, some of the turbines were not operational. Today all the turbines are now operational and it means they did something. So it is not correct, as some of you are reporting, that they have not invested any money. So, I think you need to correct that based on your experience”, he said. He, however, explained that while the turbines have been fully repaired they, like the generators, needed fuel which, in this case, is gas adding, “The more gas we get, the more power we will get”. Fashola commended the President, the Vice President, the Minister of State for Petroleum Resources, the Managing Director NNPC and all of those who are involved in producing and supplying gas and all the private investors “for the work, the commitment that we have seen, the Legislators, the Senators, Members of the House of Representatives and all in the family”. “It is a family event not just our Ministry. Everybody is doing something and we want everybody to do more”, the Minister said adding that in order to achieve success it was important that those who indulge in breaking the gas pipelines desist from the act. He declared, “But we must also appeal to our brothers who are breaking the pipelines; because it is important for all of us to understand that we can fix this problem some of which we have seen and which we have solved. There will be no life without problems. Our responsibility is to confront them, engage them and find solutions to them”. Thanking the staff of the company, especially the Nigerian workers, whom he described as “the solution to our problem”, Fashola, who praised them for the work they are doing in the place, declared, “And on behalf of Mr. President I thank you. He continues to tell me to thank all of those who are helping to build Nigeria by working hard; he continues to tell me, ‘everywhere you go, thank them for me’ and I know you are qualified for that thanks from the President”. ...
Fashola Commissions 100 Housing Units, Commends Federal Controllers As Worthy Ambassadors The Honourable Minister of Power, Works and Housing, Babatunde Raji Fashola, SAN, has commissioned 100 Housing units in Ogbomoso, Oyo State. The Ministerial Housing Scheme was financed by the Federal Mortgage Bank of Nigeria (FMBN) in collaboration with Viva International Limited. The Housing Estate is equipped with 50, 000 litres of water supply and reservoirs, 2 nos 500 KVA transformers, lush green recreational areas, fully asphalted road network with street light, walkways and drainages is expected to accommodate about 100 families. The Minister acknowledged that, ‘’though construction of the housing estate started during the tenure of the last administration, but President Buhari has proven that change does not have to be dysfunctional as a result of ideological and political differences by completing this laudable housing project’’. Fashola said that a lot of skill acquisition training programme for artisans are currently on-going in the country which in effect provides about 1,000 job opportunities to artisans who were employed during the construction of this housing project. He added that this present administration will continue to pursue infrastructural development as a way out of the nation’s economic woes. The Minister applauded the present management and the leadership of the Federal Mortgage Bank of Nigeria (FMBN) for returning the bank to profitability and disclosed that the mortgage institution returned a surplus of 2.7 billion for the first time in 20 years in 2016. Earlier in his speech, the Executive Governor of Oyo State, Senator Abiola Ajumobi represented by the Commissioner for Lands, Housing and Urban Development, Mr. Isaac Omodewu commended the efforts of the Federal Government through FMBN in bridging the housing deficit gap in the country. Sen. Ajumobi stated that because housing plays a major role in human development and other sectors of the economy, his government took the initiatives of providing housing loan to Civil Servants in the state and also operates land discount policy to encourage private developers to build in order to add to the housing stock in Oyo State. In his address, the Acting Managing Director of the Federal Mortgage Bank of Nigeria, Mr. Richard Esin, stated that this estate and other housing estates across the country are financed from the resources of the National Housing Fund (NHF) Scheme. He informed NHF contributors that the Minister has graciously approved that NHF loans of N5 million and below will now attract 100 per cent funding for the purposes of affordability. The Minister also paid a courtesy visit to the Executive Governor of Oyo State, Senator Abiola Ajumobi were he briefed the governor on the federal government intervention on housing and road projects in the state. He commended the Federal Controllers of Works and Housing, adding that they are good ambassadors and representatives of the Federal Government who should be accorded necessary support to promote socio-economy development. ...
Buhari Administration Using Infrastructure Development To Rebuild The Economy-Fashola The Federal Government under President Muhammdu Buhari is using infrastructure development as a vehicle to take the nation out of recession and rebuild the Nigerian economy; and putting the country’s resources where it is necessary for the people. The Minister of Power, Works and Housing, Mr. Babatunde Raji Fashola, SAN affirmed this during a courtesy visit on the Executive Governor of Ogun State, Senator Ibikunle Amosun as he continues his inspection tour of projects in the South-West geo-political zone. Fashola requested for collaborative effort between the state government and the Controllers of Works and Housing, appealing that they are granted access at the highest level in order for them to serve and assist the state in whatever capacity to achieve “your developmental goals politically, socially and economically” The Minister mentioned that the contractors on many of the federal roads in the state are back to construction sites and thus assisting in relating to the neighboring states of Lagos, Oyo and Ondo and further generating employment of Nigerians at the various sites. Fashola expressed appreciation for the dedication shown by the Governor Amosun in rebuilding federal roads in Ogun State and stated that the Federal Government is committed to repayment of the funds expended on federal roads. The Federal Controller of Works, Engr. Popoola, earlier said that there are 1,380 Kilometre of federal roads in Ogun State and that the Governor took it upon himself to repair some of the roads and also assisted in removing markets along the federal highways at Mowe and Ibafo. In response, Governor Amosun expressed appreciation to President Muhammadu Buhari for the intervention on the Lagos-Ibadan Expressway stressing that the road is the busiest in the country; adding that no development could get to any place without infrastructure. He requested that Ogun State should be adequately compensated for the N123bn which had been certified as expenses on federal roads out of a total of N223bn expended. Governor Amosun said that state government would be grateful if attention could be focused on the Shagamu-Ajebandele Road reconstruction as it was done on the Lagos-Ibadan expressway; adding that federal government should urgently intervene on the Papa-Olorunsogo interchange Road and the Lagos-Abeokuta old road. ...
DRIVING NIGERIA’S FUTURE: CELEBRATING TWO YEARS OF TRANSFORMATIVE LEADERSHIP AND THE LAGOS-CALABAR COASTAL HIGHWAY MILESTONE
DRIVING NIGERIA’S FUTURE: CELEBRATING TWO YEARS OF TRANSFORMATIVE LEADERSHIP AND THE LAGOS-CALABAR COASTAL HIGHWAY MILESTONE
MID -TERM REVIEW MEETING ON THE IMPLIMENTATION OF THE DECISIONS REACHED AT THE 29TH NATIONAL COUNCIL ON WORKS (NCW) DAY 1
MID -TERM REVIEW MEETING ON THE IMPLIMENTATION OF THE DECISIONS REACHED AT THE 29TH NATIONAL COUNCIL ON WORKS (NCW) DAY 1